Fig42 (1)

MATERIAL: Yoke, load bolt and load distribution strap is chrome molybdenum steel. U-Bolt is stain-less steel.

SERVICE: Recommended for suspension of high temperature piping requiring 4 to 6 inches of insulation.

MAX. TEMP: 1100°F

ORDERING: Specify figure number, nominal pipe size, and description.

NOTE: Strap provided on Fig. 43 only.

FIG. 43
HEAVY DUTY
PIPE SIZE
MAX. RECOM. LOAD (lbs.)
B
C
D
E
F
G
H
APPROX. WEIGHT (lbs. per 100)
@ 950° F @ 1050° F @ 1100° F
8 5/8 – 10 13/16
13500
12000
11500
10 1/4
2 1/4
5
14
1 3/4
1
15 1/4
7200
10 7/8 – 12 13/16
16500
15000
14500
11 3/4
2 1/4
5
15 1/4
2
1 1/8
17 3/4
10300
12 7/8 – 14 1/8
16500
15000
14500
12 1/2
2 1/4
5
16
2
1 1/8
19 1/4
11000
14 3/16 – 16 1/8
20000
19200
18500
13 3/4
2 1/2
6
17 1/2
2 1/4
1 1/4
22
16700
16 3/16 – 18 1/8
20000
19200
18500
14 3/4
2 1/2
6
18 1/2
2 1/4
1 1/4
24
18000
18 3/16 – 20 1/4
23700
22700
21900
16
2 3/4
6 1/2
20
2 1/2
1 3/8
26 1/2
22800
20 5/16 – 22 1/4
23700
22700
21900
17
2 3/4
6 1/2
21
2 1/2
1 3/8
28 1/2
24600
22 5/16 – 24 1/4
29000
28000
27000
18 1/2
3
7
22 3/4
2 3/4
1 1/2
30 3/4
32500
24 5/16 – 26 1/4
29000
28000
27000
19 1/2
3
7
23 3/4
2 3/4
1 1/2
32 3/4
34000
26 5/16 – 28 1/4
29000
28000
27000
20 1/2
3
7
24 3/4
2 3/4
1 1/2
34 3/4
35500
28 5/16 – 30 1/4
29000
28000
27000
21 1/2
3
7
25 3/4
2 3/4
1 1/2
36 3/4
36900
36
29000
28000
27000
24 1/2
3
7
28 1/2
2 3/4
1 1/2
43 1/4
42000
Top